Interior Demolition in Hamilton
Interior demolition for renovations across Hamilton, Burlington and Niagara. We remove walls, ceilings, floors and fixtures by hand, protect what stays, and leave the space broom-clean for your trades.
Interior demolition that leaves the structure ready to build on
Interior demolition is the first step of almost every renovation, and it sets the pace for every trade that follows. Our crew takes out exactly what is on your plans: drywall and plaster, ceilings, flooring, cabinets, fixtures and non-structural walls. We work by hand and with small electric tools, so there are no machines inside the building and far less risk to the walls, floors and neighbours that stay.
Before anything comes down we set up dust walls, cover floors and stairs and agree on a clear path out to the bin. As we work, metal, concrete and brick are pulled out for recycling and everything else goes straight into the bin. At handover the nails are pulled, the floors are swept and the space is ready for framing, plumbing and electrical.

Why we demolish by hand
Machines are fast outdoors, but inside a home or an occupied building they bring vibration, noise and risk. Hand demolition lets us stop at the exact line on your plans, save the trim or doors you want to keep, and work around plumbing and wiring that is staying in service.
It also keeps the site cleaner. Debris goes out in contractor bags and wheelbarrows along a protected path instead of being dragged across your floors.
How interior demolition works with us
Your GC or you pull the permit. We work to the plan, keep the site clean and stay on your schedule.
-
Walk-through
We walk the space with you or your GC and mark what goes and what stays.
Day 1 -
Written quote
Scope, schedule and price in writing, with the bin plan spelled out.
Within 48 hours -
Protect
Dust walls, zip doors and floor protection go up before any demolition starts.
First morning -
Demolition
By hand, room by room, to the scope on your plans and permit.
Most homes 3 to 8 days -
Sort & haul
Metal, concrete and brick pulled for recycling. The rest goes in the bin.
Daily -
Broom-clean
Nails pulled, floors swept and a final walk-through with you or your GC.
Handover
Interior demolition across Hamilton, Burlington and Niagara
We work in 7 communities between Brantford and the Niagara Region. Pick your town for the neighbourhoods we cover.
Interior demolition photos from the job site
See all photos-

Bathroom walls opened to the insulation
-

Wall opened for the new plan
-

Vaulted room stripped to the subfloor
-

Bathroom gutted to studs and stack
Interior demolition questions
Something else on your mind? Call Rory directly at (289) 659-1488.
Often, yes, especially if walls, plumbing or structure are changing. The permit is pulled by your general contractor or by you as the homeowner. We work to the approved permit and plans.
Most single rooms take one to two days. A full floor of a house usually takes three to five days, and a full house gut five to eight. Your written quote includes a firm schedule.
Yes, once temporary shoring is in place and your contractor's or designer's plan calls for it. We take the wall out to that plan and leave the opening clean for the new beam.
Metal, concrete and brick are sorted out for recycling. Everything else goes into a roll-off bin, placed on your driveway on protective boards.