House Gutting in Hamilton

Full house gutting for renovations and additions. We take the interior back to the studs by hand, sort the metal, concrete and brick, and hand you a clean, open shell ready for your trades.

Living room gutted to the studs with the ceiling opened to the joists
Plaster and lath outStuds left straight and sound.

Gutting a house down to the studs

A full house gut clears every interior finish so your contractor can rebuild with new wiring, plumbing, insulation and layout. We remove plaster and lath or drywall, ceilings, flooring to the subfloor or joists, kitchens, bathrooms, trim, doors and fixtures. Exterior walls, framing and anything on your keep list stay put.

Older homes across Hamilton, Dundas and Brantford are often plaster and lath, which is heavy, dusty work. We bag and wheel it out along a protected path and sweep the job every day, so neighbours and other trades are not working around piles of debris.

Gutted main floor with the staircase and studs exposed

Planning a house gut: what to sort out first

Before the walk-through, it helps to know three things: which walls and fixtures are staying, whether utilities need to be disconnected or capped by your plumber and electrician, and whether a designated substance report is needed. Homes built before the 1990s can contain asbestos in plaster, flooring or insulation. That testing, and any abatement, is done by a licensed abatement company before we start.

Once those are settled, we give you a written scope, a schedule and a bin plan, and we stick to them.

How house gutting works with us

Your GC or you pull the permit. We work to the plan, keep the site clean and stay on your schedule.

  1. Walk-through

    We walk the space with you or your GC and mark what goes and what stays.

    Day 1
  2. Written quote

    Scope, schedule and price in writing, with the bin plan spelled out.

    Within 48 hours
  3. Protect

    Dust walls, zip doors and floor protection go up before any demolition starts.

    First morning
  4. Demolition

    By hand, room by room, to the scope on your plans and permit.

    Most homes 3 to 8 days
  5. Sort & haul

    Metal, concrete and brick pulled for recycling. The rest goes in the bin.

    Daily
  6. Broom-clean

    Nails pulled, floors swept and a final walk-through with you or your GC.

    Handover

House gutting across Hamilton, Burlington and Niagara

We work in 7 communities between Brantford and the Niagara Region. Pick your town for the neighbourhoods we cover.

Map of the R.E. Anderson Contracting service area in southern Ontario, from Brantford to the Niagara Region Lake Ontario Lake Erie New York Ontario Hamilton Burlington Stoney Creek Ancaster Dundas Brantford Niagara Region

House gutting photos from the job site

See all photos
  • Bathroom walls removed to the insulation beside the window

    Bathroom walls opened to the insulation

  • Wall opened to the framing with the ductwork exposed

    Wall opened for the new plan

  • Room with a vaulted ceiling stripped to the subfloor and framing

    Vaulted room stripped to the subfloor

  • Small bathroom gutted to the studs and drain stack

    Bathroom gutted to studs and stack

House gutting questions

Something else on your mind? Call Rory directly at (289) 659-1488.

It depends on size, plaster versus drywall, how many kitchens and baths, and access for the bin. After a free walk-through we give you a fixed written quote, usually within 48 hours.

No. If testing finds asbestos or other designated substances, a licensed abatement company removes them first. We can start as soon as the area is cleared.

Usually not for a whole-house gut, because water, power and heat are often off. For a single floor we can seal off the work zone so the rest of the house stays livable.

A clean shell: framing, subfloor or joists, exterior walls and anything on your keep list. Nails are pulled, floors are swept and the bins are gone or ready for pickup.

Tell us about your project

Send the basics. We reply within one business day to book a free walk-through and written quote.

Request a walk-through

What needs to come out?

No obligation. We use your details only to reply.