Main bath gut

Second-floor bathroom down to the studs in one day, cast-iron tub to scrap.

Bathroom torn out with the old tub pulled free

About the job

A second-floor bathroom with a cast-iron tub and tile on a mortar bed. We protected the stairs, took the tub out in sections for scrap and had the room down to the studs and subfloor in a day.

Tell us about your project

Send the basics. We reply within one business day to book a free walk-through and written quote.

Request a walk-through

What needs to come out?

No obligation. We use your details only to reply.