Main bath gut
Second-floor bathroom down to the studs in one day, cast-iron tub to scrap.
About the job
A second-floor bathroom with a cast-iron tub and tile on a mortar bed. We protected the stairs, took the tub out in sections for scrap and had the room down to the studs and subfloor in a day.
Tell us about your project
Send the basics. We reply within one business day to book a free walk-through and written quote.